Vidwan-ID : 184806



  • Dr Pijush Pal Roy

  • Director
  • Dr. B. C. Roy Engineering College, Durgapur
Publications 1984 - 2021

Publications

  • 99
    Journal Articles
  • 2
    Book Chapter
  • 8
    Book
  • 9
    Conference
    Proceedings
  • 47
    Incollection
  • 1
    Review
  • 34
    Projects
  • 3
  • 1
  • 17

Citations / H-Index

381 Citations
9 h-index
220 Citations

Altmetrics

1
1
1
3
1

Google Scholar

Co-author Network


Expertise

Mathematics

Mathematics

Personal Information

Dr Pijush Pal Roy

Male
Dr. B. C. Roy Engineering College, Durgapur Department of Basic Science and Humanities, Dr. B. C. Roy Engineering College, Durgapur
Bardhaman, West Bengal, India - 713206


Experience

  • Director

    Department of Basic Science and Humanities

    Dr. B. C. Roy Engineering College, Durgapur

  • Director-in-Charge

    Administration

    CSIR-Central Mechanical Engineering Research Institute

  • Outstanding Scientist

    Rock Excavation Engineering

    CSIR-Central Institute of Mining and Fuel Research


Qualification

  • Training on IPR

    Indian Institute of Management (IIM), Ahmedabad

  • Advanced Training on Health & Safety

    University of Sunderland, UK

  • Ph.D

    Indian Institute of Technology-Indian School of Mines, Dhanbad


Honours and Awards

7

CSIR Young Scientist Award

1989

6

Whittaker Award

1993

5

National Mineral Award

2005

Read More
7

CSIR Young Scientist Award

1989

6

Whittaker Award

1993

5

National Mineral Award

2005

4

Dhanbad Gaurav Sammaan

2011

3

CSIR Technology Award

2011

2

Hindustan Zinc Ltd

1997 & 2012

1

Life-time Achievement Award

2014

Read Less

Doctoral Theses Guided

2005

An investigation into blast design parameters for Ringhole blasting and induced blasting in blasting gallery method of underground coal mines

Dr. Chhangte Sawmliana, Indian Institute of Technology-Indian School of Mines (IIT-ISM)

2005

An investigation into blast design parameters for Ringhole blasting and induced blasting in blasting gallery method of underground coal mines

Dr. Chhangte Sawmliana, Indian Institute of Technology-Indian School of Mines (IIT-ISM)

Read Less

Membership In Professional Bodies

7

The American Library

SPAN: Member

6

Indian Society of Rock Mechanics

ISRM: Past-Institutional Member

5

International Society of Explosives Engineers

USA

Read More
7

The American Library

SPAN: Member

6

Indian Society of Rock Mechanics

ISRM: Past-Institutional Member

5

International Society of Explosives Engineers

USA

4

Indian Society of Rock Mechanics & Tunnelling Technology

ISRMTT: Life Member

3

Explosives Safety & Technology Society (Visfotak)

India

2

Mining Geological & Metallurgical Institute

India

1

Computer Society of India

CSI: Institutional Member

Read Less

Membership In Committees

14

Indian delegation team to UK on

Member

13

Safety Audit Team of the Ministry of Petroleum & Natural Gas

Government of India

11

Management Council & Research Council of CSIR-Central Institute of Mining and Fuel Research

Dhanbad

Read More
14

Indian delegation team to UK on

Member

13

Safety Audit Team of the Ministry of Petroleum & Natural Gas

Government of India

11

Management Council & Research Council of CSIR-Central Institute of Mining and Fuel Research

Dhanbad

10

Senate

Academy of Scientific and Innovative Research (AcSIR)

9

Recruitment & Assessment Board (RAB)

CSIR

8

Academic Council of Indian School of Mines

Dhanbad

7

Advisory Committee (PAC) on Civil and Mechanical Engineering under SERB

DST

6

Board of Governors

Dr. B. C. Roy Polytechnic

5

Board of Governors

Dr. B. C. Roy Engineering College

4

Research Council of CSIR-IMMT (Institute of Minerals and Materials

Technology)

3

Research Council of CSIR-NGRI (National Geophysical Research Institute)

Hyderabad

2

Recruitment Assesment Board

CSIR

1

Recruitment and Assessment Board of RAC

DRDO

Read Less

Research Projects

Project Title

Funding Agency : Funding Agency

Mathematical modelling to evolve explicit relationships in the study of energy balance in rock blasting

Funding Agency : CSIR Extramural Research Division

Techno-economic assessment of drilling and blasting parameters vis-

Funding Agency : Ministry of Coal

Read More

Project Title

Funding Agency : Funding Agency

Mathematical modelling to evolve explicit relationships in the study of energy balance in rock blasting

Funding Agency : CSIR Extramural Research Division

Techno-economic assessment of drilling and blasting parameters vis-

Funding Agency : Ministry of Coal

Evaluation of damages to underground coal mines caused by surface blasting vis-a-via Establishment of blast vibration threshold

Funding Agency : Ministry of Coal

Standardization of the parameters of perimeter blasting for rock excavation in construction projects

Funding Agency : Ministry of Water Resources

Study on the effect of delay timing

Funding Agency : GAP/28/MT/MOC/2000

Investigations to optimize blast design and charge loading parameters in coal for ringhole blasting and in stone for induced blasting in degree-I gassy seams for blasting gallery method in underground mines of the Singareni Collieries Company Limited (SCCL)

Funding Agency : Ministry of Coal

Effect of production blasts

Funding Agency : GAP/006/MT/DOC/2002

Standardisation of blast vibration damage threshold for the residential structures in mining areas

Funding Agency : Ministry of Coal

A study on effect of underground blasting on surface structures vis-

Funding Agency : Ministry of Coal

Investigations into the generation of ground vibration & consequent structural damages produced due to explosives and traffic specific landslide sites and their remedial measures

Funding Agency : Defence Terrain Research Laboratory

Characterisation of rock and explosives parameters for optimal explosives energy utilisation in rock blasting

Funding Agency : Ministry of Coal

Blast design and fragmentation control - key to productivity

Funding Agency : Ministry of Coal

Blast vibration study at Aditya Limestone Mines

Funding Agency : M/s UltraTech Cement Limited

Continuous monitoring of ground vibrations during blasting operations

Funding Agency : NTPC Khargone Super Thermal Power Project

Blast vibration study at Aditya Limestone Mines

Funding Agency : UltraTech Cement Limited

Scientific study on blast induced ground vibrations at Amiliya

Funding Agency : CNP-4340/2015-16

Scientific study on blast induced ground vibrations

Funding Agency : CNP-4341/2015-16

Advice on controlled blasting operations at Gagal Limestone Mine

Funding Agency : M/s ACC Limited

Scientific study for optimisation of blast design parameters for safe blasting

Funding Agency : Tetulmari Colliery

Scientific study for optimization of controlled blast design parameters at Salaiya Limestone Mines

Funding Agency : M/s Reliance Ornatus Enterprises & Ventures Pvt. Ltd.

Scientific study to assess the impact of mining activities on the safety of Malay Dam

Funding Agency : Murma Graphite Mines of Shri Krishna Kumar Poddar

Scientific study for designing of controlled blasting parameters for the safety of structures not belonging to the owner within 100-300 m of Quarry SE

Funding Agency : West Bokaro Division

Advice for designing of controlled blasting for excavation of hard rock in Track Hopper Area of Coal Handling Plat

Funding Agency : Bokaro Thermal Power Station

Improvement and rectification of controlled blast design patterns for hard rock excavation

Funding Agency : NTPC Khargone Super Thermal Power Project site

Scientific study for controlled blasting operations within danger zone at Opencast Limestone Mines of Chittor Cement Plant

Funding Agency : Lafarge India Limited

Blasting studies for sustainable mining at Kashlog Limestone Mine

Funding Agency : Ambuja Cements Limited

Scientific study for designing of controlled blasting parameters using SME explosives

Funding Agency : Pakri Barwadih (Western Pit) Coal Mining Project of NTPC Ltd.

Scientific study for designing and planning of controlled blasting for hard rock excavation in the construction site of Screening Plant-III (SP-III Area)

Funding Agency : NMDC

Advice for safe dismantling works of unstable rock boulder using controlled blasting

Funding Agency : Brahmayoni Hill

Study to find out the reason for flying fragments during an accident on 05-04-2017 at Balkudra Outsourcing Patch of Bhurkunda

Funding Agency : CNP-4596/2017-18

Advice on control of ground vibrations

Funding Agency : Consultancy Project

Advice for optimisation of blast design parameters for flattening of Ulwe Hill as part of the land development works for construction of Navi Mumbai International Airport

Funding Agency : M/s City & Industrial Development Corporation of Maharashtra Limited (CIDCO)

Funding Agency :

Read Less

Patents





Read Less